This site uses cookies to analyse traffic and provide you with a better online experience. Learn more.
We publish the Port of Mackay shipping schedule on our website to provide all the information you need in one place to use the port.
Shipping schedules for the ports of Abbot Point, Hay Point and Weipa are available on the QSHIPS website. Just click on the 'Ship Movements' tab and then select your port from the dropdown box in the top right corner of the screen.
| Application to berth approved | ETA | Vessel | Arrival POB | ETD | Berth | Cargo | LOA | Agent | ISSC Y | |
|---|---|---|---|---|---|---|---|---|---|---|
| 24/06 | GEM SAPPHIRE | IN | 1200 04/07 | M 1 | Petroleum | 183.06 | ISS | Y | ||
| 26/06 | OCEAN TRADER | IN | 1200 05/07 | M 3 | Raw Sugar | 179.90 | GAC | Y | ||
| 09/06 | At Anchor | AFRICAN CORMORANT | 1658 04/07 | 1000 06/07 | M 5 | Fertiliser | 179.99 | ISS | Y | |
| 26/06 | 0900 04/07 | ATLANTIC GUARD | 2314 04/07 | 1600 05/07 | M 1 | Petroleum | 183.06 | GAC | Y | |
| 25/06 | 0600 05/07 | FOREVER ASSURANCE | 0004 06/07 | 0600 07/07 | M 1 | Petroleum | 183.00 | GAC | Y | |
| 29/06 | 2230 04/07 | LOCOMOTION | 0611 06/07 | 0600 09/07 | M 5 | Grain | 179.97 | MON | Y | |
| 02/07 | 0700 10/07 | STI MEMPHIS | 1727 10/07 | 2359 11/07 | M 3 | Petroleum | 183.00 | GAC | ||
12/07 | SEAL ISLAND | 12/07 | 16/07 | M 5 | Magnetite | 176.50 | MON | Y | ||
| 26/06 | 0500 18/07 | ULTRA PASSION | 1128 18/07 | 1900 20/07 | M 5 | Fertilizer | 199.98 | ISS | ||
18/07 | BUNUN XCEL | 18/07 | 20/07 | M5 | Fertilizer | WAVE | ||||
| 1445 24/07 | JULIETTA D | 1800 24/07 | 0100 29/07 | M 5 | Magnetite | ISS | ||||
22/07 | BRUCE | 22/07 | 23/07 | M 1 | Trains | 144.70 | AWSS | |||
25/07 | CARPE DIEM | 29/07 | 01/08 | M5 | Chickpeas | MON | ||||
| Permit // | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 23518 | Peter Laine | Cortis Civil & Demo - Alicia Goodin | Demolition works - Denso Shed at Port of Mackay | Port of Mackay - Denso Shed | 29/06/2026 | 03/07/2026 |
| P2W - 23468 | Paula Turner | Subsea - Ross McPhee | MH006 repairs for Boluda Towage. Extension of current PTW. Dive operations to assess and reconnect separated mooring for NQBP towage contractor cyclone mooring. | Port of Mackay - Tug boat cyclone Moorings, near Northern rock wall east of berth 5. | 29/06/2026 | 05/07/2026 |
| P2W - 23248 | Gene Sadler | Razor Demolition and Asbestos Removal Pty Ltd - Shane Worbey | Asbestos Removal - Removing 75 square metres of Asbestos Vinyl Floor Tiles | Port of Mackay - ANL Building | 22/06/2026 | 06/07/2026 |
| P2W - 23676 | Kingo Gan | Downer - Richard Diepeveen | Build a lay down pad | Port of Mackay | 01/07/2026 | 06/07/2026 |
| P2W - 23352 | Melina Taylor | Tropical Exposure - Maryse Butler | Videography and Drone photography of Container Depot for Mackay Regional Council | Port of Mackay - Container Depot | 23/06/2026 | 10/07/2026 |
| P2W - 23686 | Kingo Gan | Downer - Richard Diepeveen | Asphalt works on lay down area in Mackay port. | Port of Mackay | 07/07/2026 | 31/07/2026 |
| P2W - 22193 | Shannen Donnelly | Brendan Frier - Better Built Sheds Mackay Pty Ltd | site preparation; supply and install concrete slab; supply, delivery and construction of new three (3) bay shed in accordance with Drawings | Port of Mackay | 01/06/2026 | 30/08/2026 |
| P2W - 22543 | John Herekiuha | Liam Gannaway - Chevron Australia Downstream Pty Ltd - (IPCQ Pty Ltd) | Installation of scaffold under the roadway between the breakwater and berth 5. blasting of lightly corroded areas structural engineering assessment of Chevron wharf line pipe supports. Pending inspection results, further works may include - these will be support by future permit applications -repainting blasted areas -weld repairs and patching of heavily corroded areas - including hot work -full replacement of pipe supports where corrosion is not repairable. - including lifting | Port of Mackay - roadway between the breakwater and berth 5. | 01/06/2026 | 31/08/2026 |
| P2W - 23041 | Kingo Gan | CSE Crosscom - Grant Hughes | Continuation of the installation works for CCTV cameras at multiple locations at Port of Mackay | Port of Mackay | 15/06/2026 | 30/09/2026 |
| P2W - 23148 | David Cussen | Ward Civil and Environmental Engineering - Eric Sun | Construction of an 13,000m2 heavy-duty concrete laydown area, including all supporting infrastructire within the designated area at the Port. Supporting infrastructure includes new lighting towers, a steel reefer tower to accomodate 48 containers, stormwater drainage, site security fencing and CCTV cameras and new utilities | Port of Mackay - Existing concrete pad area adjacent to George Bell Drive | 27/01/2026 | 23/12/2026 |
| P2W - 19977 | Melina Taylor | Benjamin Bishop - Tropical Exposure | Vision acquisition of Projects, Shipping Movements & Discharges at Port of Mackay including Videography, Photography and Drone Operations, Audio interviews and Time-lapse photography. | Port of Mackay - All Berths | 25/01/2026 | 26/01/2027 |
| P2W - 19522 | John Herekiuha | Mobile Crushing Co. Pty. Ltd. - Joe Murphy | Extraction of Sand - DAF Sales Permit #20001301 | Port of Mackay - Sand Dunes | 03/02/2026 | 03/02/2027 |
| P2W - 13098 | Luke Galea | Peter Grant - JJ's Waste & Recycling | Collection and transport of Biosecurity Waste from Vessels requesting service from Mackay Harbour. | Port of Mackay | 17/02/2025 | 17/02/2027 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 23186 | Nicola Stokes | TropWATER James Cook University - Chris van de Wetering | TropWATER staff require temporary access to the Dudgeon Point property to survey a portion of the monitoring area that makes up the ports annual seagrass survey. The access will be two TropWATER staff for approx. 3-5hrs around the low tide. | Port of Hay Point -Dudgeon Point | 10/09/2026 | 10/09/2026 |
| P2W - 20678 | Luke Galea | Michael Mogford - Mogfab | Referb JJR Waste Facility at Hay Point | Port of Hay Point - JJ Richards Facility at Hay Point | 11/03/2026 | 30/09/2026 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 23062 | James Miller | Bowen Industrial Hire - Curtis Hillery | Scaffolding & Paint & Blast bollards & ladders | Port of AP - MOF | 15/06/2026 | 17/07/2026 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 22786 | Chris Luxton | Brendan Elliott - Port of Brisbane Pty Ltd | Ports of Weipa and Amrun anual maintenance dredging and sweeping 2026. Port of Brisbane supplied vessels, TSHD Brisbane, Pacific Titan and Giles S. | Port of Weipa - Ports of Weipa and Amrun, channels, berths and approaches | 11/06/2026 | 06/08/2026 |
| P2W - 22673 | Chris Luxton | Barry Smith - NaMaSys Pty Ltd | Hydrographic Survey work at Ports of Weipa and Amrun | Port of Weipa including Berths, Channels & DMPA | 04/06/2026 | 12/08/2026 |