openWe publish the Port of Mackay shipping schedule on our website to provide all the information you need in one place to use the port.
Shipping schedules for the ports of Abbot Point, Hay Point and Weipa are available on the QSHIPS website. Just click on the 'Ship Movements' tab and then select your port from the dropdown box in the top right corner of the screen.
| Application to berth approved | ETA | Vessel | Arrival POB | ETD | Berth | Cargo | LOA | Agent | ISSC Y | |
|---|---|---|---|---|---|---|---|---|---|---|
| 03/11 | NEW HANDY | IN | 0900 23/11 | M 3 | Raw Sugar | 183.00 | WAVE | Y | ||
| 16/11 | 1600 23/11 | PIONEER | 1948 23/11 | 2130 26/11 | M 4 | Refined Sugar | 168.82 | SGM | Y | |
| 16/11 | 1430 24/11 | NEW KEEPER | 2028 24/11 | 0900 26/11 | M 3 | Raw Sugar | 176.50 | GAC | Y | |
| 09/11 | 0400 27/11 | PACIFIC COBALT | 1017 27/11 | 0500 28/11 | M 3 | Petroleum | 182.50 | WAVE | Y | |
| 18/11 | 1500 28/11 | WOOYANG ELITE | 2355 28/11 | 0800 01/12 | M 5 | Fertiliser | 189.90 | ISS | ||
| 16/11 | 1400 28/11 | ORIENTAL GREENSTONE | 2355 28/11 | 1000 30/11 | M 1 | Petroleum | 183.06 | GAC | ||
| 17/11 | 1100 29/11 | UM SHIMANTO | 0106 30/11 | 0400 01/12 | M 1 | Petroleum | 183.06 | GAC | Y | |
30/11 | SUNSHINE EXPRESS | 0832 01/12 | 02/12 | M 1 | Petroleum | WAVE | ||||
14/12 | DYNAMOGRACHT | 14/12 | 18/12 | M 5 | Scrap Steel | 156.93 | MON | |||
| Permit // | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 26807 | David Cussen | Mahmoud Geranmayeh | Installation of Communications | Port of Mackay - South Breakwater and Container Laydown | 06/11/2026 | 20/11/2026 |
| P2W - 26527 | David Cussen | Nathan Gardner - Hardline Industries | Complete conduit installation works on George Bell Drive The scope includes the following - Underboring George Bell Drive - Scan for existing services - Hydro excavate Eastern side of the road - Excavate Western side of the road - Installation of the base slab and uni-culvert | Port of Mackay - George Bell Drive | 02/11/2026 | 30/11/2026 |
| P2W - 26618 | Paul Ogden | Redfox Corporation - John Delahunty | Install Security Camera | Port of Mackay - M5 Berth | 09/11/2026 | 30/11/2026 |
| P2W - 26788 | Renee McGlashan | Cascade Ecology Pty Ltd - Sandra Walters | Ecology surveys in the vicinity of North Harbour Beach to support the rock armour wall and beach access ramp project, and ongoing ecological management of North Harbour beach | Mackay - North Harbour beach, north of the harbour rock wall, and adjacent dunes | 08/11/2026 | 30/11/2026 |
| P2W - 25831 | John Herekiuha | Graincorp - Phillip Mammone | Replacement of S3 Conveyor belt, Head Pulley and refurbishment of the chute. Replacement of 8 Shiploader pulleys on the Shiploader and structural remediation work son the shiploader. All Works impact Wharf 5 at Mackay Harbour. | Port of Mackay - M5 Berth | 30/11/2026 | 04/12/2026 |
| P2W - 27005 | Melina Taylor | Mark Fitzpatrick | Photography for Brand Guideline refresh including people hero images and updated Port of Mackay images. | Locations will be Port of Mackay, North Wall Recreation area and Mulherin Park. | 12/11/2026 | 11/12/2026 |
| P2W - 26233 | Tim Lewis | Barry Smith -NaMaSys Pty Ltd | Hydrographic Survey work at Ports of Mackay and Hay Point | Ports of Hay Pt & Mackay | 15/10/2026 | 15/12/2026 |
| P2W - 231Abbot Point and Lake Caley and surrounding locations48 | David Cussen | Ward Civil and Environmental Engineering - Eric Sun | Construction of an 13,000m2 heavy-duty concrete laydown area, including all supporting infrastructire within the designated area at the Port. Supporting infrastructure includes new lighting towers, a steel reefer tower to accomodate 48 containers, stormwater drainage, site security fencing and CCTV cameras and new utilities | Port of Mackay - Existing concrete pad area adjacent to George Bell Drive | 27/01/2026 | 23/12/2026 |
| P2W - 24938 | John Herekiuha | Liam Gannaway - Chevron Australia Downstream Pty Ltd - (IPCQ Pty Ltd) | Ongoing Inspections of scaffold under the roadway between the breakwater and berth 5, and demobilisation of scaffold on completion. Replacement of pipe supports - pipe supports are being fabricated offsite and installed onsite using a Franna crane and a combination of hung scaffold and under bridge unit to access areas under the roadway. Hot work (grinder, oxy torch) required to shorten existing studs to remove corroded pipe supports | Port of Mackay - roadway between the breakwater and berth 5. | 01/06/2026 | 31/12/2026 |
| P2W - 25959 | Anthony Lee | Michael Mogford - Mogfab | ANL build repairs and Footing installation | ANL building - Mackay | 06/10/2026 | 31/12/2026 |
| P2W - 27443 | Dave Cussen | Justin Canino - Redfox Corporation | Mackay - Container Laydown | Installation of Communications | 20/11/2026 | 31/12/2026 |
| P2W - 19977 | Melina Taylor | Benjamin Bishop - Tropical Exposure | Vision acquisition of Projects, Shipping Movements & Discharges at Port of Mackay including Videography, Photography and Drone Operations, Audio interviews and Time-lapse photography. | Port of Mackay - All Berths | 25/01/2026 | 26/01/2027 |
| P2W - 19522 | John Herekiuha | Mobile Crushing Co. Pty. Ltd. - Joe Murphy | Extraction of Sand - DAF Sales Permit #20001301 | Port of Mackay - Sand Dunes | 03/02/2026 | 03/02/2027 |
| P2W - 13098 | Luke Galea | Peter Grant - JJ's Waste & Recycling | Collection and transport of Biosecurity Waste from Vessels requesting service from Mackay Harbour. | Port of Mackay | 17/02/2025 | 17/02/2027 |
| P2W - 26226 | Anna Riddell | Liana Lillford CS Environmental (formerlly Catchment Solutions) | Stormwater Surface Water Sampling for 2026/7 Wet Season | Port of Mackay Harbour - Various locations outside harbour | 16/10/2026 | 30/04/2027 |
| P2W - 25128 | Luke Galea | YUWI Aboriginal Corporation | Weed Management for properties of NQBP land (4 sites) | Bedford Paddock/ Eastern Wetlands/Dunes North Wall/ Kommo Toera Trail | 01/07/2026 | 30/06/2027 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 26789 | Evan Bates | Peter Johnson - Champ Services | Hay Point VTS Building Site Set-Up. This includes scaffold access to the roof and a handrail system around the parapet roof of the building, and set up of works for pre works for the roof replacement. | Hay Point - VTS Building | 09/11/2026 | 29/01/2027 |
| P2W - 27417 | Evan Bates | Peter johnson -Champ Group | VTS Roof Replacement | Hay Point -VTS Building | 23/11/2026 | 26/02/2027 |
| P2W - 26924 | Luke Galea | Yuwi Aboriginal Corporation - Pamela Young | Mowing and whipper snipping and spraying, and litter and green waste collection of North Queensland Bulk Ports (NQBP) vacant land parcel lots at Louisa Creek and park area near Highwater Islet Drive, Half Tide beach | Hay Point -Louisa Creek NQBP owned parcels (excluding bushland lots 4,15,5,11 and 13) | 02/11/2026 | 01/11/2027 |
| P2W - 27090 | Evan Bates | Redfox Corporation Pty Ltd - John Delahunty | VTS Roof Replacement | Hay Point -VTS Admin Building | 16/11/2026 | 31/12/2027 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 27400 | Paul Ogden | Redfox Corporation - Justin Canino | Replace faulty NVR | Abbott Point - Abbott Point Hut | 19/11/2026 | 21/11/2026 |
| P2W - 26755 | Jack Parker | Paul Burgis | Fenceline vegetation maintenance using a mulcher to ensure trees are not overhanging and don’t compromise the security and integrity of the existing security fence. | Abbott Point -southern stockyard road fenceline. | 09/11/2026 | 04/12/2026 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 25143 | Nick Boustead | Bhagwan Marine | Bhagwan MArine will be conducting subsea wharf inspecitons of Lorim POint, Hey River Terminal, Evans Landing and Humbug Terminal on behalf of Rio Tinto Australia. The inspection works will invovle commercial diving from a Dive support Vessel "Kougari". | Weipa - Lorim Point, Hey River Terminal, Humbug terminal, Evans Landing | 14/09/2026 | 28/11/2026 |