This site uses cookies to analyse traffic and provide you with a better online experience. Learn more.
Ports
Port of Hay Point
openPort of Mackay
openPort of Abbot Point
openPort of Weipa
openCommunity Assets
Southern Breakwater
openBowen Jetty
openKommo Toera Trail
openOld Mulherin Park
openMt Bassett look out
openHay Point look out
openNorth Wall Rec Area
openWe publish the Port of Mackay shipping schedule on our website to provide all the information you need in one place to use the port.
Shipping schedules for the ports of Abbot Point, Hay Point and Weipa are available on the QSHIPS website. Just click on the 'Ship Movements' tab and then select your port from the dropdown box in the top right corner of the screen.
| Stage | ETA | Vessel | Arrival POB |
ETD | Berth | Cargo | LOA | Agent |
|---|---|---|---|---|---|---|---|---|
| Approved | [Test Vesssel] - For Manual Creation | M 4 | 0.00 | |||||
| Approved | 22/08 |
NORD BREMEN | 0300 22/08 |
0900 23/08 |
M 3 | RAWSUGAR | 182.93 | Wave Shipping Pty Ltd |
| Voyage Complete | 09/08 |
AFRICAN FLAMINGO | 0608 09/08 |
0800 10/08 |
M 5 | FERTILIS | 199.90 | Inchcape Shipping Services (Queensland) |
| Voyage Complete | 11/08 |
FOREVER SPLENDOR | 1956 11/08 |
1900 12/08 |
M 1 | DIESEL | 183.20 | Wilhelmsen Port Services (Mackay) |
| In Port | OCEAN MAKMUR | IN | 1600 20/08 |
M 5 | SORGHUM | 199.99 | Monson Agencies Australia (Mackay) | |
| Arrival | 16/08 |
EVA PEARL | 0440 16/08 |
0001 19/08 |
M 4 | MOLASSES | 145.53 | Wave Shipping Pty Ltd |
| Approved | 20/08 |
ARDMORE ENCOUNTER | 1423 20/08 |
2359 21/08 |
M 3 | PETROL | 183.00 | Gulf Agency Company (Mackay) |
| Approved | 21/08 |
HANNA BULKER | 1635 21/08 |
0730 23/08 |
M 5 | FERTILIS | 179.99 | Inchcape Shipping Services (Queensland) |
| Approved | 22/08 |
DEE4 NERIUM | 1740 22/08 |
1930 23/08 |
M 1 | PETROL | 183.06 | Gulf Agency Company (Mackay) |
| Arrival | DEE4 NERIUM | 0400 24/08 |
0530 25/08 |
M 3 | PETROL | 183.06 | Gulf Agency Company (Mackay) | |
| Approved | 24/08 |
PACIFIC KOHINOOR | 0648 24/08 |
0830 25/08 |
M 5 | PETROL | 182.50 | Gulf Agency Company (Mackay) |
| Approved | 24/08 |
NORD TAIPEI | 0103 25/08 |
0900 26/08 |
M 3 | RAWSUGAR | 177.00 | Gulf Agency Company (Mackay) |
| Approved | 26/08 |
HOEGH AUSTRALIS | 1351 26/08 |
2300 26/08 |
M 3 | MACHINER | 199.92 | Seaway Agencies Pty Ltd |
| Voyage Complete | NORD TAIPEI | 0403 27/08 |
1800 29/08 |
M 1 | DIESEL | 177.00 | Wave Shipping Pty Ltd |
Last updated 2049 18/11/2026
| Permit // | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 24546 | Paul Ogden | Redfox Corporation - Wayne Gunther | Hardware and Security Maintenance | Port of Mackay | 14/08/2026 | 28/08/2026 |
| P2W - 24803 | Jack Parker | Department of Primary Industries - Sina Leis | Biosecurity survey for invasive ants. Surveys involve placing non toxic lures (sausage) along linear tracks. Lures marked by survey tape and placed in areas away from vehicle or people traffic. | Port of Mackay - Foreshore perimeter and set down areas | 27/08/2026 | 28/08/2026 |
| P2W - 22193 | Shannen Donnelly | Brendan Frier - Better Built Sheds Mackay Pty Ltd | site preparation; supply and install concrete slab; supply, delivery and construction of new three (3) bay shed in accordance with Drawings | Port of Mackay | 01/06/2026 | 30/08/2026 |
| P2W - 22543 | John Herekiuha | Liam Gannaway - Chevron Australia Downstream Pty Ltd - (IPCQ Pty Ltd) | Installation of scaffold under the roadway between the breakwater and berth 5. blasting of lightly corroded areas structural engineering assessment of Chevron wharf line pipe supports. Pending inspection results, further works may include - these will be support by future permit applications -repainting blasted areas -weld repairs and patching of heavily corroded areas - including hot work -full replacement of pipe supports where corrosion is not repairable. - including lifting | Port of Mackay - roadway between the breakwater and berth 5. | 01/06/2026 | 31/08/2026 |
| P2W - 24684 | Jack Parker | CS Environmental - Josh Potter | Plankton tow sampling in the port basin. Undertaken from NQBP water vessel. 2 workers plus skipper on board. Task expected to take approximately 6 hours | Port of Mackay - Mackay basin and mackay harbour marina area. | 24/08/2026 | 04/09/2026 |
| P2W - 23041 | Kingo Gan | CSE Crosscom - Grant Hughes | Continuation of the installation works for CCTV cameras at multiple locations at Port of Mackay | Port of Mackay | 15/06/2026 | 30/09/2026 |
| P2W - 24634 | John Herekiuka | Graincorp - Phillip Mammone | The planned scope includes:Replacement of the belt on the S3 conveyor;Replacement of the S3 head pulley;Repairs to the S3 head chute;A second crew replacing eight pulleys on the boom conveyor | Port of Mackay - S3 belt, west wharf access and departure road | 07/09/2026 | 07/11/2026 |
| P2W - 23148 | David Cussen | Ward Civil and Environmental Engineering - Eric Sun | Construction of an 13,000m2 heavy-duty concrete laydown area, including all supporting infrastructire within the designated area at the Port. Supporting infrastructure includes new lighting towers, a steel reefer tower to accomodate 48 containers, stormwater drainage, site security fencing and CCTV cameras and new utilities | Port of Mackay - Existing concrete pad area adjacent to George Bell Drive | 27/01/2026 | 23/12/2026 |
| P2W - 24256 | Paul Ogden | Redfox Corporation - Justin Canino | Hardware and Network Maintenance | Port of Mackay | 29/07/2026 | 31/012/2026 |
| P2W - 19977 | Melina Taylor | Benjamin Bishop - Tropical Exposure | Vision acquisition of Projects, Shipping Movements & Discharges at Port of Mackay including Videography, Photography and Drone Operations, Audio interviews and Time-lapse photography. | Port of Mackay - All Berths | 25/01/2026 | 26/01/2027 |
| P2W - 19522 | John Herekiuha | Mobile Crushing Co. Pty. Ltd. - Joe Murphy | Extraction of Sand - DAF Sales Permit #20001301 | Port of Mackay - Sand Dunes | 03/02/2026 | 03/02/2027 |
| P2W - 13098 | Luke Galea | Peter Grant - JJ's Waste & Recycling | Collection and transport of Biosecurity Waste from Vessels requesting service from Mackay Harbour. | Port of Mackay | 17/02/2025 | 17/02/2027 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 23186 | Nicola Stokes | TropWATER James Cook University - Chris van de Wetering | TropWATER staff require temporary access to the Dudgeon Point property to survey a portion of the monitoring area that makes up the ports annual seagrass survey. The access will be two TropWATER staff for approx. 3-5hrs around the low tide. | Port of Hay Point -Dudgeon Point | 10/09/2026 | 10/09/2026 |
| P2W - 24248 | Luke Galea | JJ Richards Quarantine Waste Facility - Richard Lange | Undertake the removal of redundant and decommissioned Autoclave 58-02 (Principal-owned asset) located at the JJ Richards Quarantine Waste Facility, Hay Point, prior to Autoclave 58-02 being removed, a new 20mm diameter stainless steel air line to the new Autoclave Air Dryer is to be supplied and installed, inclusive of ball valve and “T piece” to supply existing Autoclave until change over to the new Autoclave. | Port of Hay Point - JJ Richards Quarantine Waste Facility | 10/08/2026 | 11/09/2026 |
| P2W - 20678 | Luke Galea | Michael Mogford - Mogfab | Referb JJR Waste Facility at Hay Point | Port of Hay Point - JJ Richards Facility at Hay Point | 11/03/2026 | 30/09/2026 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|
| P2W - 24125 | Luke Galea | Bowen Industrial Hire - Scott Brogan | Reinstate access ladders and remove scaffolding | Port of Abbot Point - MOF | 27/07/2026 | 27/08/2026 |
| P2W - 24292 | James Miller | Brian Smith | Tree maintenance | Port of Abbot Point - Abbot Point Rd | 01/08/2026 | 31/08/2026 |
| Permit # | NQBP contact | Permit holder | Activity | Location | Start | Completion |
|---|---|---|---|---|---|---|