Shipping schedules

We publish the Port of Mackay shipping schedule on our website to provide all the information you need in one place to use the port.

Shipping schedules for the ports of Abbot Point, Hay Point and Weipa are available on the QSHIPS website. Just click on the 'Ship Movements' tab and then select your port from the dropdown box in the top right corner of the screen.

Live Port of Mackay shipping schedule

Table from API:

Stage ETA Vessel Arrival
POB
ETD Berth Cargo LOA Agent
Approved   [Test Vesssel] - For Manual Creation     M 4   0.00  
Approved
22/08
NORD BREMEN 0300
22/08
0900
23/08
M 3 RAWSUGAR 182.93 Wave Shipping Pty Ltd
Voyage Complete
09/08
AFRICAN FLAMINGO 0608
09/08
0800
10/08
M 5 FERTILIS 199.90 Inchcape Shipping Services (Queensland)
Voyage Complete
11/08
FOREVER SPLENDOR 1956
11/08
1900
12/08
M 1 DIESEL 183.20 Wilhelmsen Port Services (Mackay)
In Port   OCEAN MAKMUR IN 1600
20/08
M 5 SORGHUM 199.99 Monson Agencies Australia (Mackay)
Arrival
16/08
EVA PEARL 0440
16/08
0001
19/08
M 4 MOLASSES 145.53 Wave Shipping Pty Ltd
Approved
20/08
ARDMORE ENCOUNTER 1423
20/08
2359
21/08
M 3 PETROL 183.00 Gulf Agency Company (Mackay)
Approved
21/08
HANNA BULKER 1635
21/08
0730
23/08
M 5 FERTILIS 179.99 Inchcape Shipping Services (Queensland)
Approved
22/08
DEE4 NERIUM 1740
22/08
1930
23/08
M 1 PETROL 183.06 Gulf Agency Company (Mackay)
Arrival   DEE4 NERIUM 0400
24/08
0530
25/08
M 3 PETROL 183.06 Gulf Agency Company (Mackay)
Approved
24/08
PACIFIC KOHINOOR 0648
24/08
0830
25/08
M 5 PETROL 182.50 Gulf Agency Company (Mackay)
Approved
24/08
NORD TAIPEI 0103
25/08
0900
26/08
M 3 RAWSUGAR 177.00 Gulf Agency Company (Mackay)
Approved
26/08
HOEGH AUSTRALIS 1351
26/08
2300
26/08
M 3 MACHINER 199.92 Seaway Agencies Pty Ltd
Voyage Complete   NORD TAIPEI 0403
27/08
1800
29/08
M 1 DIESEL 177.00 Wave Shipping Pty Ltd

Last updated 2049 18/11/2026

Permit to work - Port of Mackay

Permit // NQBP contactPermit holderActivityLocationStartCompletion
P2W - 24546Paul OgdenRedfox Corporation - Wayne GuntherHardware and Security MaintenancePort of Mackay14/08/202628/08/2026
P2W - 24803Jack ParkerDepartment of Primary Industries -  Sina LeisBiosecurity survey for invasive ants. Surveys involve placing non toxic lures (sausage) along linear tracks. Lures marked by survey tape and placed in areas away from vehicle or people traffic.Port of Mackay - Foreshore perimeter and set down areas27/08/202628/08/2026
P2W - 22193Shannen DonnellyBrendan Frier - Better Built Sheds Mackay Pty Ltdsite preparation; supply and install concrete slab; supply, delivery and construction of new three (3) bay shed in accordance with DrawingsPort of Mackay01/06/202630/08/2026
P2W - 22543John HerekiuhaLiam Gannaway - Chevron Australia Downstream Pty Ltd - (IPCQ Pty Ltd)Installation of scaffold under the roadway between the breakwater and berth 5. blasting of lightly corroded areas structural engineering assessment of Chevron wharf line pipe supports. Pending inspection results, further works may include - these will be support by future permit applications -repainting blasted areas -weld repairs and patching of heavily corroded areas - including hot work -full replacement of pipe supports where corrosion is not repairable. - including liftingPort of Mackay - roadway between the breakwater and berth 5.01/06/202631/08/2026
P2W - 24684Jack ParkerCS Environmental - Josh PotterPlankton tow sampling in the port basin. Undertaken from NQBP water vessel. 2 workers plus skipper on board. Task expected to take approximately 6 hoursPort of Mackay - Mackay basin and mackay harbour marina area.24/08/202604/09/2026
P2W - 23041Kingo GanCSE Crosscom - Grant HughesContinuation of the installation works for CCTV cameras at multiple locations at Port of MackayPort of Mackay15/06/202630/09/2026
P2W - 24634John HerekiukaGraincorp - Phillip MammoneThe planned scope includes:Replacement of the belt on the S3 conveyor;Replacement of the S3 head pulley;Repairs to the S3 head chute;A second crew replacing eight pulleys on the boom conveyorPort of Mackay - S3 belt, west wharf access and departure road07/09/202607/11/2026
P2W - 23148David CussenWard Civil and Environmental Engineering - Eric SunConstruction of an 13,000m2 heavy-duty concrete laydown area, including all supporting infrastructire within the designated area at the Port. Supporting infrastructure includes new lighting towers, a steel reefer tower to accomodate 48 containers, stormwater drainage, site security fencing and CCTV cameras and new utilitiesPort of Mackay - Existing concrete pad area adjacent to George Bell Drive27/01/202623/12/2026
P2W - 24256Paul OgdenRedfox Corporation - Justin CaninoHardware and Network MaintenancePort of Mackay29/07/202631/012/2026
P2W - 19977Melina TaylorBenjamin Bishop - Tropical ExposureVision acquisition of Projects, Shipping Movements & Discharges at Port of Mackay including Videography, Photography and Drone Operations, Audio interviews and Time-lapse photography.Port of Mackay - All Berths25/01/202626/01/2027
P2W - 19522John HerekiuhaMobile Crushing Co. Pty. Ltd. - Joe MurphyExtraction of Sand - DAF Sales Permit #20001301Port of Mackay - Sand Dunes03/02/202603/02/2027
P2W - 13098Luke GaleaPeter Grant - JJ's Waste & RecyclingCollection and transport of Biosecurity Waste from Vessels requesting service from Mackay Harbour.Port of Mackay17/02/202517/02/2027

Permit to work - Port of Hay Point

Permit #NQBP contactPermit holderActivityLocationStartCompletion
P2W - 23186Nicola StokesTropWATER James Cook University - Chris van de WeteringTropWATER staff require temporary access to the Dudgeon Point property to survey a portion of the monitoring area that makes up the ports annual seagrass survey. The access will be two TropWATER staff for approx. 3-5hrs around the low tide.Port of Hay Point -Dudgeon Point10/09/202610/09/2026
P2W - 24248Luke GaleaJJ Richards Quarantine Waste Facility - Richard LangeUndertake the removal of redundant and decommissioned Autoclave 58-02 (Principal-owned asset) located at the JJ Richards Quarantine Waste Facility, Hay Point, prior to Autoclave 58-02 being removed, a new 20mm diameter stainless steel air line to the new Autoclave Air Dryer is to be supplied and installed, inclusive of ball valve and “T piece” to supply existing Autoclave until change over to the new Autoclave.Port of Hay Point - JJ Richards Quarantine Waste Facility10/08/202611/09/2026
P2W - 20678Luke GaleaMichael Mogford - MogfabReferb JJR Waste Facility at Hay PointPort of Hay Point - JJ Richards Facility at Hay Point11/03/202630/09/2026

Permit to work - Port of Abbot Point

Permit #NQBP contactPermit holderActivityLocationStartCompletion
P2W - 24125Luke GaleaBowen Industrial Hire - Scott BroganReinstate access ladders and remove scaffoldingPort of Abbot Point -  MOF27/07/202627/08/2026
P2W - 24292James MillerBrian SmithTree maintenancePort of Abbot Point - Abbot Point Rd01/08/202631/08/2026

Permit to work - Port of Weipa

Permit #NQBP contactPermit holderActivityLocationStartCompletion
      
  • Last updated   1307   24/08/2026

Reset Table